Long interconnection queues and large loads from bitcoin mining created opportunities for co-located PV and data centers. This client wanted to understand the possibility to co-locate PV with an existing coal power plant to support its data center operations.
HRE evaluated multiple feasible technical configurations, proposed an interconnection approach, and provided estimated project costs to minimize interconnection cost and risk.
The client was pleased with HRE’s analysis and requested further support the subsequent stage of obtaining the interconnection and engineering, procurement, and construction.