U.S. Department of Defense established 14 days of energy self-sufficiency and resiliency requirements at all military installations. A military base seeked to determine the most cost effective configuration to meet this requirement using a combination of PV, BESS, and generator.
HRE analyzed the load profile and developed different configurations of equipment sizing that would meet resiliency needs based on design day (worst case scenario) and average day consumptions.
HRE’s recommended system sizing helped client addresses energy resiliency challenges to bolster military operations.