Case Study

PV Sizing and Interconnection for “Green Crypto Mining” Operation

Client Type
Crypto mining data centers
Project Type
Interconnections, System sizing
Location
United States
Challenge

Long interconnection queues and large loads from bitcoin mining created opportunities for co-located PV and data centers. This client wanted to understand the possibility to co-locate PV with an existing coal power plant to support its data center operations.

Solution

HRE evaluated multiple feasible technical configurations, proposed an interconnection approach, and provided estimated project costs to minimize interconnection cost and risk.

Result

The client was pleased with HRE’s analysis and requested further support the subsequent stage of obtaining the interconnection and engineering, procurement, and construction.